# EXX822 upgrade - mainframe CICS broker stubs

**URL:** <https://techcommunity.softwareag.com/t/exx822-upgrade-mainframe-cics-broker-stubs/99839>\
**Category:** Forum\
**Tags:** Mainframe-Integration, EntireX\
**Created:** [March 8, 2012, 3:43pm UTC](https://techcommunity.softwareag.com/t/exx822-upgrade-mainframe-cics-broker-stubs/99839 "2012-03-08T15:43:42Z")\
**Posts on this page:** 5\
**Page:** 1

<div class="post-metadata">

**Author:** ![Belinda1](https://avatars.discourse-cdn.com/v4/letter/b/f0a364/32.png) [@Belinda1](https://techcommunity.softwareag.com/u/Belinda1)\
**Post date:** [March 8, 2012, 3:43pm UTC](https://techcommunity.softwareag.com/t/exx822-upgrade-mainframe-cics-broker-stubs/99839/1 "2012-03-08T15:43:42Z")

</div>

Greetings - long time Adabas & Natural user. Relative Newbie for EntireX.

On the mainframe the only thing we use are the broker stubs in CICS.

Our original installation, 8.0.x, required a PLT entry for LRINCIZD.  
The upgrade to 8.1.x continued to deliver this module.

With 8.2.2, this module is no longer delivered in the EXX.LOAD library.

The EXXCICS member in the jobs library remove the PPT entries.

Is the PLT entry still required?

Where might I find this in the documentation? Specifics please.

Thanks,

Belinda

---

<div class="post-metadata">

**Author:** ![Brian\_Johnson1](https://sea1.discourse-cdn.com/techcommunity/user_avatar/techcommunity.softwareag.com/brian_johnson1/32/163_2.png) [@Brian\_Johnson1](https://techcommunity.softwareag.com/u/Brian_Johnson1)\
**Post date:** [March 8, 2012, 6:13pm UTC](https://techcommunity.softwareag.com/t/exx822-upgrade-mainframe-cics-broker-stubs/99839/2 "2012-03-08T18:13:11Z")

</div>

Hi Belinda,

EntireX newbie here, too… so not sure if this helps but will try.

There is some info I found here on PLT entries for starting the EntireX RPC Server under CICS:  
[http://techcommunity.softwareag.com/ecosystem/documentation/webmethods/wmsuites/wmsuite8-2\_sp2/EntireX/8-2-SP2\_EntireX/adminZos/rpcServerCics.htm#Top](http://techcommunity.softwareag.com/ecosystem/documentation/webmethods/wmsuites/wmsuite8-2_sp2/EntireX/8-2-SP2_EntireX/adminZos/rpcServerCics.htm#Top)

> [@](#):
>
> To start the server during the initialization of CICS
> 
> If the COBOL source ERXSTART of the EntireX installation library EXPvrs.SCOB has not been defined in the CICS CSD data sets by the installation job $INSTALL, define it.  
> Customize and compile ERXSTART if necessary.  
> Add the following entry to your CICS PLTPI table (second phase PLT program):  
> DFHPLT TYPE=ENTRY,PROGRAM=ERXSTART
> 
> To stop the server during the shutdown of CICS
> 
> If the COBOL source ERXSTOP of the EntireX installation library EXPvrs.SCOB has not been defined in the CICS CSD data sets by the installation job $INSTALL, define it.  
> Customize and compile ERXSTOP if necessary.  
> Add the following entry to your CICS PLTSD table (first phase PLT program)  
> DFHPLT TYPE=ENTRY,PROGRAM=COBSTOP.  
> See also EntireX RPC Server Return Codes.

Similarly in the installation manual at [http://techcommunity.softwareag.com/ecosystem/documentation/webmethods/wmsuites/wmsuite8-2\_sp2/EntireX/8-2-SP2\_EntireX/installZos/rpcServers.htm#rpcServers\_autostartCics](http://techcommunity.softwareag.com/ecosystem/documentation/webmethods/wmsuites/wmsuite8-2_sp2/EntireX/8-2-SP2_EntireX/installZos/rpcServers.htm#rpcServers_autostartCics)

> [@](#):
>
> Starting the EntireX RPC Server Automatically on CICS Startup (Optional)
> 
> To start the RPC server automatically on CICS startup
> 
> Insert a new PLT entry “DFHPLT TYPE=ENTRY,PROGRAM= ERXSTART”.  
> Rebuild the PLT for CICS startup.  
> Note:  
> The EXPvrs.LD00 CICS load library contains a precompiled ERXSTART module with the default settings of the COBOL source member ERXSTART in EXPvrs.SRCE
> 
> Stopping the EntireX RPC Server Automatically on CICS Shutdown (Optional)
> 
> To stop the RPC server automatically on CICS shutdown
> 
> Insert a new PLT entry “DFHPLT TYPE=ENTRY,PROGRAM= ERXSTOP”.  
> Rebuild the PLT for CICS shutdown.  
> Note:  
> The EXPvrs.LD00 CICS load library contains a precompiled ERXSTOP module with the default settings of the COBOL source member ERXSTOP in EXPvrs.SRCE

Unfortunately, I have no direct experience here as we are running the Broker as a started task and Natural RPC Servers on the mainframe and XML RPC Servers on Windows. The runtime entirex.jar has been deployed under JBoss and WebLogic. We are running none of this under CICS other than what we needed to define in the Natural nuke to allow for a batch Natural RPC Server and for batch or online Natural to make calls to services registered to the Broker.

Hope this points you in the right direction! Us long-time Adabas/Natural folks have to stick together on learning and using EntireX.

Regds,

---

<div class="post-metadata">

**Author:** ![Douglas\_Kelly](https://sea1.discourse-cdn.com/techcommunity/user_avatar/techcommunity.softwareag.com/douglas_kelly/32/102_2.png) [@Douglas\_Kelly](https://techcommunity.softwareag.com/u/Douglas_Kelly)\
**Post date:** [March 8, 2012, 8:47pm UTC](https://techcommunity.softwareag.com/t/exx822-upgrade-mainframe-cics-broker-stubs/99839/3 "2012-03-08T20:47:08Z")

</div>

LRINCIZD is related to the Relay Manager, which has been dropped as the functionality it provided is now incorporated into the broker stubs. You no longer need this PLT entry.

[http://techcommunity.softwareag.com/ecosystem/documentation/webmethods/wmsuites/wmsuite8-2\_sp2/EntireX/8-2-SP2\_EntireX/relnotes/plat\_cov.htm#droppedThisRelease](http://techcommunity.softwareag.com/ecosystem/documentation/webmethods/wmsuites/wmsuite8-2_sp2/EntireX/8-2-SP2_EntireX/relnotes/plat_cov.htm#droppedThisRelease)

> [@](#):
>
> Functionality Dropped in this Release
> 
> The Relay Manager has been dropped. Functionality previously performed by the Relay Manager is now handled by the broker stubs.

---

<div class="post-metadata">

**Author:** ![Belinda1](https://avatars.discourse-cdn.com/v4/letter/b/f0a364/32.png) [@Belinda1](https://techcommunity.softwareag.com/u/Belinda1)\
**Post date:** [March 8, 2012, 9:06pm UTC](https://techcommunity.softwareag.com/t/exx822-upgrade-mainframe-cics-broker-stubs/99839/4 "2012-03-08T21:06:08Z")

</div>

I knew that the Relay Manager was dropped starting with v81. I could see the removal of the PPT entries. But there was no mention of removal of the PLT entry. And, since the modules were still on the distributed software, they remained in our mix.

Thanks for the guidance,

Belinda

---

<div class="post-metadata">

**Author:** ![system](https://global.discourse-cdn.com/techcommunity/original/3X/c/d/cd19967bb605d28a72d77eb83a1cae22f3df2eb8.svg) [@system](https://techcommunity.softwareag.com/u/system)\
**Post date:** [April 2, 2021, 3:01pm UTC](https://techcommunity.softwareag.com/t/exx822-upgrade-mainframe-cics-broker-stubs/99839/5 "2021-04-02T15:01:37Z")

</div>

Closed on April 2, 2021, 3:01pm UTC


